Evi Air Source Heat Pump

  • Free sample for Heat Pump Air To Water China - -25c work 38.5kw mono block EVI Air Source Heat Pump water heater model NERS-G10D – New Energy

    Free sample for Heat Pump Air To Water China - -25c work 38.5kw mono block EVI Air Source Heat Pump water heater model NERS-G10D – New Energy

    GD series EVI low temperature heat pump(-25dC~43dC) Item   NERS-B3S-D NERS-B5S-D NERS-G10D NERS-G20D NERS-G40D Rated heating capicity KW 10.4 19.7 38.5 72 140 Input power  KW 2.38 4.69 9.38 18.5 35.4 Voltage   V/Hz/Ph  380/50/3 380/50/3 380/50/3 380/50/3 380/50/3 Rated current A 11/3.7 8.4 16.8 33.1 63.3 Rated output water temperature  °C 55°C       Max temp.: 60°C Hot water ouput L/H 250  420  830  1504  3010  Refrigeration   R407C Control mode   Microcomputer central pr...
  • Fast delivery Family Heat Pump - -25c work 19.7kw mono block EVI Air Source Heat Pump water heater model B5S-D – New Energy

    Fast delivery Family Heat Pump - -25c work 19.7kw mono block EVI Air Source Heat Pump water heater model B5S-D – New Energy

    GD series EVI low temperature heat pump(-25dC~43dC) Item   NERS-B3S-D NERS-B5S-D NERS-G10D NERS-G20D NERS-G40D Rated heating capicity KW 10.4 19.7 38.5 72 140 Input power  KW 2.38 4.69 9.38 18.5 35.4 Voltage   V/Hz/Ph  380/50/3 380/50/3 380/50/3 380/50/3 380/50/3 Rated current A 11/3.7 8.4 16.8 33.1 63.3 Rated output water temperature  °C 55°C       Max temp.: 60°C Hot water ouput L/H 250  420  830  1504  3010  Refrigeration   R407C Control mode   Microcomputer central pr...
  • -25c work 10.4kw mono block EVI Air Source Heat Pump water heater model B3S-D

    -25c work 10.4kw mono block EVI Air Source Heat Pump water heater model B3S-D

    Model                                           NERS-B3S-D
    MOQ                                           10-20 Units(1-2 Sample available with stocks)
    Compressor Brand                      Copeland
    Place of Origin                            china
    Rated heating                             capicity 10.4KW
    Delivery Time                               7-15 working days
    Payment Terms                            L/C , T/T, WEST UNION
    Certification                                 ISO9001, CE, erP Energy Label, ROHS, EMC